Deeper-draft dock complex downstream of Kolkata.
Haldia, downstream of Kolkata on the Hooghly estuary, is part of the Kolkata port trust and handles deeper-draft vessels than the Kolkata docks themselves.
For Nepal it plays the same role as Kolkata — an eastern gateway feeding the Birgunj rail corridor — and the two are usually quoted together as “Kolkata/Haldia.” Larger vessels from the Far East and Europe often discharge here rather than at the shallower Kolkata docks.
Inland leg to Birgunj ICD: ~770 km · ~3–6 days (after port release). Mode: Broad-gauge rail + road.
Feeds the Birgunj ICD.
Transit times and distances are indicative planning ranges, not quotes — confirm with your freight forwarder. See the shipping overview for the full corridor and transit-time tables.